[1 ]A system reliability approach for evaluating stability of rock wedges with correlated failure modes.Computers and Geotechnics,36 (2009) 1298–1307
[2 ]Risk based maintenance planning for deteriorating slopes.Natural Hazards and Earth System Sciences,30(2): 130-143,2009
[3 ]Updating occurrence probability and size of defect for bored piles.Structural Safety,,2008.30(2): 130-143
[4 ]Closure to Reliability evaluation of cross-hole sonic logging for bored pile integrity.Journal of Geotechnical and Geoenvironmental Engineering,2007
[5 ]Level of construction control and safety of driven piles.Soils and Foundations,2006, 46(4): 415-426
[6 ]Impact of routine quality assurance on reliability of bored piles.Journal of Geotechnical and Geoenvironmental Engineering,2006, 132(5): 622-630
[7 ]Cost-benefit assessment of inspection and repair planning for ship structures considering corrosion.China Ocean Engineering,2005, 19(3), 409-420.
[8 ]Reliability evaluation of pile foundation considering different failure criteria.Canadian Geotechnical Journal,2005,42(4): 1086-1093.
[9 ]Reliability evaluation of cross-hole sonic logging for bored pile integrity.Journal of Geotechnical and Geoenvironmental Engineering (American Society of Civil Engineering),2005, 131(9): 1130-1138
[10]考虑多失效模式相关的岩质边坡体系可靠度分析.岩石力学与工程学报,2009, 28 (3): 541-551
[11]基于N维等效方法的岩质边坡楔体稳定体系可靠度分.岩石力学与工程学报,2009, 28(7): 1415-1424.
[12]水工钢闸门主梁系统可靠度分析.水利学报,2009, 40(7): 870-877
[13]基于贝叶斯理论的灌注桩多个缺陷的统计特性分析.岩土力学,2008.29(9): 2492~2497
[14]基桩可靠度分析的统计相关性评价方法.岩土力学,2008.29(3): 633~638
[15]考虑桩底沉渣的灌注桩可靠度分析方法.岩土力学,2008.29(1): 155~160
[16]不同失效准则下桩基可靠度评估.岩土力学,2007, 28(3): 540-543
[17]Response to discussion on updating statistics of multiple defects in bored piles.HKIE Transactions,2007,14(3), 49-49
[18]Reliability analysis of skin plates on hydraulic gates.HKIE Transactions,2007,14(3), 33-39.
[19]Reliability assessment and acceptance criteria for hydraulic gates considering corrosion deteriorati.HKIE Transactions,2007,14(2), 19-25
[20]Updating statistics of multiple defects in bored piles.HKIE Transactions,2007, 14(1): 50-53
[21]Closure to Reliability evaluation of cross-hole sonic logging for bored pile integrity.Journal of Geotechnical and Geoenvironmental Engineering,2007, 133(3): 343-344.
[22]考虑时间效应的滑坡风险评估和管理.岩土力学,2006, 27(12): 2239-2245
[23]打入桩承载力确定方法对安全系数的影响.岩土力学,2006, 27(10): 1733-1738
[24]土钉抗拔试验对粘结强度估计的影响.四川大学学报(工程科学版),2006年 03期 ,17-23
[25]船体结构腐蚀模型不确定性对检测及维修规划的影响.中国造船,2005,46(1):80-90
[26]船体结构腐蚀检测及维修规划的成本-效益分析.上海交通大学学报,2005, 39(5): 665-669