1. Xiang Zeng, Tiesong Hu*, Lihua Xiong, Zhixian Cao, Chongyu Xu. Derivation of operation rules for reservoirs in parallel with joint water demand [J]. Water Resources Research, 2015, 51 (12): 9539-9563. doi:10.1002/ 2015WR017250

2.  Xinjie Li, Guoming Gao, Tiesong Hu, Huaibao Ma & Tao Li . Multiple time scales analysis of runoff series based on the Chaos Theory, Desalination and Water Treatment, 2014, 52:13-15, 2741-2749, DOI:10.1080/ 19443994. 2013. 813667

3.  Zeng Xiang, Tiesong Hu*, Xuning Guo, Xinjie Li. Water Transfer Triggering Mechanism for Multi-Reservoir Operation in Inter-Basin Water Transfer-Supply Project. Water Resources Management, 2014, 28 (5): 1293–1308. DOI 10.1007/ s11269-014-0541-2

4.  Tao Zhang*, Tiesong Hu, Xuning Guo, Zhong Chen, Yue Zheng. Solving high dimensional bilevel multiobjective programming problem using a hybrid particle swarm optimization algorithm with crossover operator. Knowledge-Based Systems, 2013,53:13-19. Doi:10. 1016/j.knosys.2013.07.015

5.  Xiang Fu, Tao Tao, Hui Wang, Tiesong Hu. Risk Assessment of Lake Flooding Considering Propagation of Uncertainty from Rainfall: Case Study. Journal of Hydrologic Engineering. 2013, 18(8):1041-1047. doi: 10.1061 /(ASCE) HE. 1943 -5584. 0000700

6.  Xuning GuoTiesong Hu*Conglin Wu Tao Zhang & Yibing Lv. Multi-Objective Optimization of the Proposed Multi-Reservoir Operating Policy Using Improved NSPSO. Water Resources Management, 2013, 27 (7): 21372153. DOI 10.1007/ s11269 -013 -0280-9

7.  Xuning Guo, Tiesong Hu*, Tao Zhang, Yibing Lv. Extension of parametric rule with the hedging rule for managing multi-reservoir system during droughts. Journal of Water Resources Planning and Management, 2013, 139(2):139-148. DOI: 10.1061/(ASCE) WR. 1943-5452.0000241.

8.  Xuning Guo*, Tiesong Hu, Tao Zhang, Yibing Lv. Bilevel model for multi-reservoir operating policy in inter-basin water transfer-supply project. Journal of Hydrology, 2012, 425-426(252-263) DOI: 10.1016/j.jhydrol. 2012. 01. 006 

9.  Tao Zhang, Tiesong Hu, Jia-wei Chen*, Zhongping Wan, and Xuning Guo. Solving Bilevel Multiobjective Programming Problem by Elite Quantum Behaved Particle Swarm Optimization. Abstract and Applied Analysis, 2012,1-20,   doi:10.1155/2012/102482 

10.Tao Zhang*, Tiesong Hu, Yue Zheng, and Xuning Guo. An Improved Particle Swarm Optimization for Solving Bilevel Multiobjective Programming Problem. Journal of Applied Mathematics, 2012,1-13. DOI: 10.1155/2012/626717

11.Wen Sun, Tiesong Hu, Zhong Chen, Shihua Chen, Lei Xiao. Impulsive synchronization of a general nonlinear coupled complex network. Commun Nonlinear Sci Numer Simulat, 2011,16(11): 4501-4507 

12.Qiang Tang, Junchan Zhao & Tiesong Hu. Detecting Chaos time series via complex network feature.  Modern Physics Letters B, 2011, 25(23): 18891896. 

13.Tiesong Hu, Xuning Guo*, Xiang Fu, Yibing Lv. A neural network approach for solving linear bilevel programming problem. Knowledge-Based Systems, 2010, 23:239-242

14.Bing Huang, Tiesong Hu., BLP approach for the estimation of variogram parameters. Environmental Earth Sciences, 2009, 59(2):421-428

15.Yibing Lv,Tiesong Hu and Zhongping Wan. A penalty function method for solving inverse optimal value problem, Journal of Computational and Applied Mathematics, 2008220(1-2):175-180

16.Yibing Lv, Tiesong Hu, Guangmin Wang, Zhongping Wan. A neural network approach for solving nonlinear bilevel programming problem. Computers & Mathematics with Applications2008,55(12):2823-2829

17.Yan Jiang, Tiesong Hu, ChongChao Huang and Xianing Wu. An Improved Particle Swarm Optimization Algorithm. Applied Mathematics and Computation, 2007, 193(1): 231-239.

18.Tiesong Hu, Fengyan Wu and Xiang Zhang. Rainfall–runoff modeling using principal component analysis and neural network. Nordic Hydrology, 2007, 38(3):235~248.

19.Yibing Lv, Tiesong Hu and Zhongping Wan, A penalty function method for solving weak price control problem, Applied Mathematics and Computation, 2007, 186(2): 1520-1525.

20.Yibing Lv, Tiesong Hu, Guangmin Wang and Zhongping Wan, A penalty function method based on KuhnTucker condition for solving linear bilevel programming, Applied Mathematics and Computation, 2007,188(1):808-813.

21.Tiesong Hu., Lam, K. C. and NG, Thomas. A modified neural network for improving river flow prediction. Hydrological Sciences Journal, 2005, 50(2): 299-318.

22.Tiesong Hu.Estimating surface soil moisture using NOAA/AVHRR and ground station meteorological data. JOURNAL OF EXPERIMENTAL BOTANY 2003, 54: 36-36 Suppl. 1.

23.Tiesong Hu., Lam, K. C. and NG, Thomas. River flow time series prediction with range-dependent neural network, Hydrological Sciences Journal, 200146(5): 729~745.